For a school, the only good time to replace cabling, install new WiFi or rebuild a computer lab is when the students are away. The December holiday is the longest window of the year, and by the time the school closes, the work needs to be planned, quoted and approved already.
The long holiday is the one time a school can rewire classrooms and replace equipment without disrupting lessons. Planning in November is what makes the work possible in December.
A network upgrade involves a site survey, a design, a quotation, approval by the board or bursar, ordering equipment and scheduling the crew. Each step takes time, and the end of the year is busy for everyone. A school that starts in November can have a crew on site the week the students leave.
A good upgrade starts by documenting what is already there: where the cables run, which rooms have poor coverage, what the internet connection really delivers and what equipment is too old to keep. The survey also catches what is easy to miss, such as a switch in a classroom cupboard with no ventilation or a lab on a circuit that trips.
A single figure for "network upgrade" makes it hard for a board to decide. An itemised quotation shows the cost of each part, so the school can phase the work across holidays if the budget does not cover everything at once.
Wave Fiber Technologies works with schools across Kenya on internet, structured cabling, WiFi, CCTV, access control and backup power. If your school wants work done this December, contact us now so the survey can happen before closing day.
Photograph: Wikimedia Commons, public domain.
Written by the engineers who do the work, and worth reading against the date it carries: what is true of this equipment changes.
Send us the building, the distances and the problem you are solving. We will come back with a survey date and an honest view of what it takes.
Ask an engineer